Project Name | Max test load(kN) | Pile Diameter(M) | Quantity(NO.) |
---|---|---|---|
Meikarta Project, Indonesia | 10000/6000 | 1.0/0.6 | 700 |
Manila MRT Line 7, Philippines | 7200/4000/9000 | 1.5/1.0 | 3 |
Improvement to Sungei Pandan Kechil, Singapore | 7000/6500/11600/9550 | 0.8 | 4 |
Country Garden Forest City Project – SJER, Malaysia | 19200/15800/27200/15800/12800 | 1/0.9/1.2/0.9/0.8 | 5 |
Maple Crest Apartment Building, Canada | 3000 | 1.3 | 1 |
Sky Sancturary project, Malaysia | 33260/43424/31800 | 1.35/1.5/1.5 | 3 |
Yushan Bridge, Zhejiang, China | 70000/120000/70000/120000 | 3.4/3.8/4.0/4.0 | 4 |
Qidu Bridge Project, Zhejiang, China | 44590 | 2.5 | 1 |
Beijing Metro line 19, China | 11500/11830/44360 | 1/1.8 | 9 |
Hezhang Gymnasium, Guizhou, China | 12276/19112 | 0.9/1.1 | 5 |
Taizhou Bay Bridge and its connection project | 5700~15000 | 1.3~2 | 61 |
Xiangyang Railway, Hubei, China | 36000 | 1.2 | 2 |
Ougan Technology Co., Ltd,-Copyright© 2008-2019
浙ICP备10000181号 33011802000764号 技术支持:杭州故乡人网络
bi-directional load test pile load test load cell pile capacity test Foundation Equipment Division