2017-12-08

Ougan Technology executed yet the load capacity test for the Qidu Bridge Project in Wenzhou, China. Double-level Super Cells were used to test the pile capacity of a 2.5m Ø pile. The single pile testing load is 44 590 kN.
 
The Qidu Bridge crosses the Ouganjiang River, connecting two townships of Qidu and Wuniu in the city of Wenzhou, Zhejiang, China. 
 
The bridge stretches 1866 meters in length, and has three lanes on either side, designed for vehicles driving at 60 km/hour. 
 
Pile testing overview: 
  Single pile testing load Pile diameter Pile length
Pile 44 590 kN ( (10 024 kip) 2.5 m (98.4 in) 87m (285.5 ft)