The Hangzhou Bay Bridge
2017-06-13

The construction of Hangzhou Bay Bridge commenced on November 14, 2003, and was completed on June 26, 2007. Shortly after on May 1, 2008, the bridge connecting municipalities of Jiaxing and Ningbo in Zhejiang province was open to the public. The bridge stretches 36 km (22 mi) in length, and held the longest bridge in the world at the time of its completion. Even up to this day, the Hangzhou Bay Bridge ranks third in length, after American Lake Pontchartrain Causeway and Qingdao Jiaozhou Bay Bridge.

In 2005, Ougan Technology provided solutions with our patented Super-cell technology and in-fiend service to one Bi-Directional Load Test for the bridge’s pile capacity and load test.

Single Pile Testing load: 70,000kN (15,736kip)
Pile diameter: 2.2m (86.6in)

 






Tel:+86-571 28223950
+86-571 28027060
FAX:+86-571 28993137
E-mail:info@ougangroup.com
info@super-cell.com
Address:14F, UNIT C, WANDA PLAZA, HANGXING RD, GONGSHU DISTRICT, HANGZHOU, 310015, P.R.CHINA